Cloud Migration

Cloud migration is the move of applications, data and workloads from one environment to another: from on-premise servers to a cloud platform, or between providers. It is a project with a date and a cutover, not a purchase that happens the moment you sign.

Enquire about this catalogue

What it covers

  • Inventory and fit: what exists, how it depends on other parts, and which pieces are candidates to lift as-is versus rework for the new environment.
  • Workload moves: the actual transfer of applications and data, with a tested way back if the move does not hold.
  • Re-architecture where it pays: fixing known weaknesses at the cost of one move instead of carrying them forward.
  • Cutover: the final switch, the fallback and the evidence that the new environment is stable before the old one is retired.

Common failure points

  • Migrating to keep the same problem: a slow, expensive or fragile system moved to the cloud stays slow, expensive or fragile. The move changed the location, not the performance.
  • Hidden dependencies: a job that depends on a local path or an old database version breaks on day two, not day one.
  • Dual-running cost: running both environments in parallel during the transition is real money. An open-ended transition is a recurring bill.

What to decide up front

  • Scope and order: which workloads move first, which wait, and what the exit criteria are for each.
  • Cost model: the monthly shape of the new environment, including egress and idle capacity, not just the launch numbers.
  • Rollback: what state is preserved, how long, and what triggers a return to the old environment.

How NobleConsul can help

Where relevant, NobleConsul may support the fit assessment of the current environment, the ordering of workloads for the move, and the design of the cutover and rollback plan, as possible consulting activities.

Enquire about this catalogue